• Structure Earthquake resistant RCC frame structure
  • Flooring Vitrified anti-skid ceramic tiles
  • Doors Seasoned hardwood with polished/painted flush door. Toilet doors with powder coated aluminum.
  • Windows Aluminum anodized windows with sliding glass shutter and net.
  • Toilets Ceramic Tiles on walls up to facility level, good quality WC and wash basins with chrome plated fittings, provision of hot and cold water.
  • Kitchen Granite counter with stainless steel sink, glazed tiles up to 2 feet above counter, cabinets below counter, provision of exhaust fan, hot and cold water system.
  • Balcony Anti-skid ceramic tiles in floor, decorative steel railings.
  • Walls and Ceilings Acrylic distemper paint with putty, false ceilings in kitchen and toilets.
  • External Finishes Textured paint.
  • Electrical Works Concealed wiring with copper wires in PVC conduits.
  • Plumbing Works Heavy duty UPVC pipes will be used for water supply.
  • Security System 24-hour security guard will be deployed.
  • Power Backup Power generator for Lifts and pump rooms for un- interrupted power supply.
  • Fire Fighting As per Government norms.